Southeast multifamily

Apartment and multifamily countertops are not a scaled-up kitchen remodel. Unit counts, schedule gates, lot matching, and install sequencing decide whether surfaces help or hurt your close. I am Ken Leitch, Director of Multifamily for Majestic Surfaces, based in Charleston and focused on Southeast multifamily work. If you need granite or quartz—and options by class—for communities where price, consistency, and communication matter, this page is for general contractors, developers, and property managers who want a surfaces partner who picks up the phone.

Explore this guide   GCs   Developers   Property managers   Specs & schedule

For federally funded projects, see our BABA quartz countertops guide for sourcing and manufacturer documentation.

What multifamily countertops require vs. single-family

Single-family work often revolves around one kitchen, one design conversation, and a flexible install window. Multifamily is different:

  • Volume and repetition. Dozens or hundreds of kitchens and baths with the same or limited SKUs. Spec drift between buildings or phases creates punch-list noise.
  • Consistency across lots. Color, pattern, and thickness need to read the same from unit to unit. Buyers and PMs notice when slab lots jump mid-building.
  • Template-to-install discipline. Templates, cut lists, sink cutouts, and delivery by building/floor must track the GC’s schedule—not the other way around.
  • Budget by class, not by showroom dream. Product selection has to survive value engineering without looking “value engineered” in the model and the rentals.

That is the work I do: connect your project requirements to Majestic Surfaces’ fabrication and sourcing paths so countertops land on time, look

One point of contact who understands pre-con. Multifamily surfaces fail when sales, fab, and field are three different stories. You need someone who can talk schedule, specs, and pricing in the same conversation.

Materials that fit multifamily: quartz, granite, solid surface, and laminate by class

There is no single “right” surface for every apartment community. Product choice depends on class, wear expectations, maintenance, and first cost. Common paths:

Quartz

Engineered quartz is a frequent multifamily choice for kitchens and baths when you want a non-porous look, consistent color, and predictable patterning across many units. Good for communities that sell or lease on design photos—slab-to-slab variance is generally tighter than natural stone. Spec thickness, edge profiles, and approved colorways early so purchasing and fab stay aligned.

Granite

Granite still belongs in multifamily when natural stone is part of the brand story or a specific finish is required. Lot control matters more here: plan for matching within buildings or phases, and set expectations with the design team on movement and variation. Granite can be a strong fit when priced and sourced correctly for the program.

Solid surface

Solid surface often shows up in baths, wet bars, or locations where seams, repairability, and integrated sinks matter. Useful when durability and cleanability outweigh the desire for a stone look. Confirm brand/series, thickness, and edge details in the finish schedule so field install matches

Laminate (by class)

Laminate remains a practical option for certain unit tiers, secondary spaces, or value-driven buildings. Specify substrate, edge treatment, and colorways clearly. Laminate is not “less professional” when it is the right product for the class—it is a wrong product when it is substituted late without updating the design package.

Majestic Surfaces works with granite and quartz as core offerings for multifamily, with local fabrication or overseas-sourced product depending on what the project needs for price, lead time, and look. We will not push a single path if your schedule or budget says otherwise.

Local fabrication vs. overseas / import sourcing

GCs and developers often ask which is better: domestic fab or overseas-sourced material. The honest answer is: it depends on the job.

  • Local fabrication can help when you need tighter control on templates, faster response to field changes, and shorter feedback loops between site and shop. Useful when buildings release in waves and dimensions shift.
  • Overseas / import sourcing can help when the program needs competitively priced volume and a locked colorway at scale. Lead times, container logistics, and lot planning have to be built into the schedule—not treated as an afterthought.

What matters is matching the supply path to your start dates, model unit deadlines, and install sequence. I will walk that tradeoff with you in plain language: cost, risk, and what has to be decided by when.

the approved submittal.

consistent, and stay competitively priced.

Specs and logistics GCs actually care about

Pretty boards do not finish buildings. These are the items that keep multifamily countertops from becoming a delay:

Templates and field measure

Clarify who templates, when (relative to cabinets/plumbing), and how changes are documented. Multifamily punch lists grow when templates lag cabinet set or when sink centers move after cut lists are released.

Lots and color consistency

Agree on how lots are allocated—by building, by floor, by phase. For quartz and granite programs, lot discipline is as important as the color name on the finish schedule.

Sinks, faucets, and cutouts

Undermount vs. drop-in, faucet hole counts, soap dispensers, and cooktop cutouts need to be frozen in the submittal package. Late fixture changes are a common source of remakes and schedule slip.

Edge profiles and thickness

Keep profiles limited across the community unless design requires variety. Every extra edge and thickness combination adds complexity for fab and QC.

Timelines and sequencing

Surfaces should track your building release schedule: model units first, then floors/buildings in the order you need certificates of occupancy and leases. Share your lookahead early so material and fab capacity are reserved against real dates.

Access, storage, and protection

Elevator use, floor protection, and unit readiness affect install productivity. A short pre-install coordination call saves days of “we showed up and the cabinets weren’t set.”

Bring your finish schedule, unit matrix, and target install windows. We will map product and process to that—not the other way around.

Southeast footprint: Charleston-based, multifamily-focused

I am based in Charleston and work multifamily surfaces across the Southeast with Majestic Surfaces. The goal is straightforward: be the surfaces contact for GCs, developers, and property managers who need granite and quartz programs that hold up under volume, inspection, and leasing pressure.

If your project is in the Southeast and countertops are on the critical path—or about to be—reach out early in pre-con or when you are locking finishes. Earlier is better for sourcing path, pricing, and schedule certainty.

Why work with Ken / Majestic Surfaces

You do not need another brochure. You need a partner who understands multifamily constraints and can get answers without a runaround.

  • Multifamily is the job, not a sideline. My role is Director of Multifamily—pre-construction and procurement conversations for apartment and multifamily countertops are the day-to-day work.
  • Majestic Surfaces. Fabrication and sourcing options that include local fab or overseas-sourced product, so we can aim for competitive pricing without pretending every project is identical.
  • Granite and quartz, specified for the class. Material recommendations tied to your building’s positioning and budget—not a one-size showroom pitch.
  • Someone who picks up the phone. Schedule questions, lot issues, and field changes need a real response. You will get that.

I will not invent certainty I cannot deliver. If a date or a price depends on a decision you have not made yet, I will say so and tell you what we need next.

How to start a conversation

Send the basics: market/location, unit count (or building count), target materials, rough install windows, and whether you need local fab emphasis or are open to overseas-sourced programs for price. If you have a finish schedule or unit matrix, include it.

Get in touch — or use the contact options on the homepage. Tell me you are calling about multifamily countertops and I will take it from there.

Frequently Asked Questions

How long are lead times for multifamily countertops?

For in-house fabrication, material lead time can be up to 90 days. Because we fabricate in house, shop drawing approval is less critical than material lead time. Once we get the go-ahead to produce, we are 7–10 days out. For cut-to-size, shop drawings must be signed off, and lead time is 120–150 days for the product to arrive in the USA.

Quartz or granite for apartments?

Both perform well. Quartz is non-porous, consistent from slab to slab, and low-maintenance. It is typically more durable than granite and requires less overhang support, which makes it the most common multifamily choice. Granite can be a strong value option in certain colors and holds up well to heat.

What is the difference between local fabrication and cut-to-size?

Local fabrication means slabs are templated (if required or allowed by schedule), cut, and finished in our regional shop. Cut-to-size means tops are produced overseas to standard unit dimensions and shipped ready to install. Cut-to-size can lower cost on repetitive layouts; local fabrication gives more flexibility and faster turnaround on changes.

Can you handle phased installs by building or floor?

Yes. We schedule templating (if required or allowed by schedule), fabrication, and install to follow your release schedule.

What is BABA, and can you supply compliant material?

BABA (the Build America, Buy America Act) requires American-made materials on many federally funded projects. We can source domestically fabricated options and provide the documentation.

Which states do you serve?

South Carolina, North Carolina, and Georgia, plus parts of Virginia, Tennessee, and Florida.

How do I get a bid, and what do you need?

Send architectural plans, finish schedules, and unit counts by type. If you have alternates or a target budget, include them and I will price the spec plus value-engineered options.

Do you price value-engineered alternates?

Yes. Every bid can include the specified material plus alternates in different colors, thicknesses, or sources, so you can see the cost trade-offs side by side.

Do you handle amenity spaces too?

Yes. Clubhouses, outdoor kitchens, grill stations, and other one-off spaces are priced separately from unit tops.

What sets you apart?

I have worked in commercial and multifamily countertops since 1998. I focus on clear bids, realistic schedules, and staying responsive from bid to final install.

Do you only work on multifamily, or also single-family?

My focus is multifamily and apartment communities—GCs, developers, and property managers who need volume-ready countertop programs. If your project is multifamily in the Southeast, that is the right fit for this conversation.

Can you do quartz and granite on the same community?

Yes. Many programs mix materials by area (for example, quartz in kitchens and a different product in baths) or by unit tier. The key is locking the matrix early so purchasing, lots, and install sequencing stay clean.

Ready to talk through your next countertop package?

Send the basics: market/location, unit count, target materials, rough install windows, and whether you need local fabrication emphasis or are open to overseas-sourced programs for price. Tell me you are calling about multifamily countertops and I will take it from there.